Frequently Asked Questions
Automatic Sliding Glass Door FAQs
Practical answers for early selection, quotation preparation and system coordination.
What information is required to select an automatic sliding glass door?
Selection starts with project location, opening size, side space, leaf construction and weight, quantity, traffic, activation, safety, access control and supply scope. Drawings or site photographs help reduce assumptions.
How are the opening size and door-leaf weight confirmed?
They are confirmed from the architectural opening, intended passage, movement, available travel, glass and frame construction, hardware and verified moving weight.
What sensors are required for activation and safety?
The package depends on entrance geometry, approach direction, pedestrian flow, door movement and monitored area. It may use a combined device or separate activation and presence-safety devices.
Can the door connect to an access-control system?
A selected controller may receive commands from card readers, keypads, face-recognition terminals, reception controls or building systems. Signal type, logic, locking and compatibility must be confirmed.
Can SEPPES supply a complete door or an operator-only package?
Our main focus is complete door supply. Operator systems, components and accessories are generally supplied to existing customers as replacement, spare or repair parts. Large-volume standalone requirements, such as hundreds or thousands of sets, can be discussed separately. The quotation identifies included items and interfaces.
What glass and frame information should be provided?
Provide proposed leaf dimensions, glass construction and thickness, frame or hardware details, visible finish and estimated moving weight.
What affects the price of an automatic sliding glass door?
Price depends on opening size, leaf construction and weight, operator, sensors, controller functions, access and locking interfaces, finishes, supply scope, quantity, packaging and logistics.
What drawings are required before production?
The required set depends on supply scope and project stage. Opening dimensions, layout, fixed panels, structural support, operator position, power and control interfaces should be confirmed before release.